What does an add-on balcony cost? Prices & costs
What does an add-on balcony cost? The price depends on size, number of storeys, flooring, railing, colour, staircase and additional services. Configure your balcony online and see the price of your chosen specification.
In short
The cost of an add-on balcony depends mainly on size, number of storeys, railing, flooring, colour, staircase and additional services. NOVODACH does not quote a flat price per square metre: the 3D configurator shows the price of your selection. Structural design, building permit, survey and installation are clarified separately unless expressly included in the quotation.
What the price covers and what is clarified separately
| Item | How it is handled |
|---|---|
| Structure, flooring, railing, colour | Choose in the configurator; the price applies to exactly this selection. |
| Delivery | Scope and price are stated in the quotation; after approval delivery usually takes 8–11 weeks. |
| Structural design | Optional service; scope and price are agreed separately. |
| Building permit | Support is optional; you clarify the requirements for your location with the building authority. |
| Survey and foundations | To be clarified per project; not automatically included in the balcony price. |
| Installation | Self-assembly or installation through partner companies, only if expressly agreed. |
Frequently asked questions
The price depends on dimensions, storeys, flooring, railing and specification. Calculate your selection in the 3D configurator and check delivery, VAT and additional services in the stated scope of supply.
Start in the configurator with the dimensions you need and one storey. Compare flooring, railing and extra options using the displayed price. Check the scope of supply and separate costs before comparing quotations.
For one storey, calculate the area from width × depth. Divide the price of the specific configuration by that area. Only compare the same specification and scope of supply; delivery, installation and other services must be clearly allocated.
The expressly stated scope of supply is decisive. Installation, structural design, survey and building permit are agreed separately and must not be assumed to be included automatically.